Electrical Panel Upgrade RFP Template
Service upgrade or main panel replacement for commercial or multi-unit buildings.
When to use this template
Your existing electrical service is undersized, aging, or required for a building expansion / EV charging / new tenant. Common in older commercial and multi-unit residential buildings.
Sample title
Electrical Panel / Service Upgrade — [Property Name]
Summary
Upgrade existing [X]A main electrical service to [X]A at our [property type]. Includes new main panel, utility coordination, and any required sub-panel work.
Scope of work
Scope of work: - Engineering / design (or coordination with our consulting engineer). - Utility coordination for service upgrade (LDC connection / metering). - Decommission existing main panel. - Supply and install new [X]A main panel with appropriate breaker configuration. - Supply and install [#] new sub-panels (if required). - New service conductors from utility connection to panel. - All grounding and bonding per Canadian Electrical Code. - ESA / provincial inspection coordination and certificate. - Permits. - Tenant downtime: managed to under [X] hours; after-hours work if needed (disclose premium). Add-alternates: - New sub-panels per floor / per area. - EV charging panel + circuit allowance. - Generator transfer switch. - Surge protection.
Standard requirements
- Master electrician on staff. - ESA-licensed contractor (Ontario) or provincial equivalent. - $5M general liability insurance. - WSIB clearance. - Three references for similar service upgrades in the last 24 months. - Plan for managing tenant power outage during cut-over. - Coordination with local utility and building inspector.
Suggested timeline
- RFP open: 30 days.
- Site walk: Top 3 bidders walk site with engineer.
- Award: Within 2 weeks of site walks.
- Permit + utility lead time: Typically 4–12 weeks for service upgrade approval.
- Installation: Cut-over typically 1 evening / weekend; full project 4–6 weeks.
Site access & logistics
Main electrical room access via [location]. Cut-over to be scheduled off-hours to minimize tenant impact.
Questions every bidder should answer
- What's the engineering / permit cost, and is it included?
- What's the lead time from award to utility cut-over?
- How will you manage tenant power outage?
- Per-unit cost for additional sub-panels (add-alts)?
- What ESA / inspection costs are included?
Evaluation criteria
- Total installed cost.
- Engineering / utility coordination quality.
- Tenant downtime plan.
- References for similar service upgrades.
- Master electrician and crew experience.