Flat Roof Replacement RFP Template
Tear-off + new single-ply membrane on a commercial or multi-unit building.
When to use this template
Your existing flat roof is past 75% of its expected life, you've had repeat leaks, or your reserve study has flagged replacement in the next 12–24 months. Works for commercial buildings, mid-rise residential, and multi-unit properties with low-slope membrane roofs (TPO, EPDM, modified bitumen, BUR).
Sample title
Flat Roof Replacement — [Property Name / Address]
Summary
Tear-off and replacement of the existing low-slope membrane roof on our [size] sq ft commercial property. Looking for a 20+ year warranty and a certified installer.
Scope of work
Scope of work: - Tear-off and disposal of existing roof system down to deck (estimated [X] sq ft). - Inspect and report on deck condition; quote allowance for deck repair as separate line item. - Install new tapered insulation to current code R-value and positive drainage. - Install new single-ply membrane system (vendor to specify: TPO, EPDM, or modified bitumen) with manufacturer-certified installation. - All flashings, edge metal, drains, and penetrations included. - Daily site cleanup; final disposal manifest provided. - Final manufacturer inspection and issuance of NDL warranty. Out of scope unless quoted as add-alternates: - Structural deck replacement beyond [X]% of total area. - Roof access modifications (ladders, hatches). - HVAC unit reset / re-curbing.
Standard requirements
- $5M general liability insurance with PMRFP / building owner named as additional insured (certificate required before mobilization). - WSIB clearance certificate in good standing. - Manufacturer-certified installer for the membrane system being bid. - Three references for similar projects (size + membrane type) completed in the last 24 months. - Roofer must hold a current certification with the membrane manufacturer being bid. - Project manager assigned to the job with site contact info.
Suggested timeline
- RFP open: 21 days for trades to express interest and submit pricing.
- Shortlist + site walk-throughs: Top 3 invited to walk the roof and finalize quote.
- Award + contract: Decision within 1 week of site walks; standard CCDC short-form contract.
- Mobilization: Within 4 weeks of award (weather permitting).
- Project completion: Typically 2–4 weeks once started, depending on roof size and weather.
Site access & logistics
Roof access via interior stairwell + roof hatch. Crane staging area available in north parking lot (limited, must coordinate). Work hours 7am–6pm weekdays; weekend work requires advance approval.
Questions every bidder should answer
- Which membrane system are you proposing and why (vs. alternatives)?
- What manufacturer NDL warranty length and coverage do you offer?
- How will you protect the building interior from leaks during tear-off?
- What's your protocol if you discover wet insulation or rotted deck mid-job?
- Per-square-foot rate for additional deck repair (T&M allowance)?
- What's the projected timeline from mobilization to final inspection?
Evaluation criteria
- Total cost (including disclosed add-alternates).
- Membrane and warranty quality.
- References — comparable size + scope completed in last 24 months.
- Project timeline and ability to meet our desired completion window.
- Quality of submission and clarity of scope.