Corridor Flooring Replacement RFP Template
Carpet, LVT, or vinyl plank replacement in multi-unit corridors.
When to use this template
Existing carpet or flooring in corridors is worn, stained, or off-trend. Common in mid-rise residential and office buildings. Best scoped at full-floor or full-corridor level for consistent look.
Sample title
Corridor Flooring Replacement — [Property Name] — [X] floors
Summary
Replace corridor flooring across [X] floors of our [property type]. Bidders to propose two options: commercial-grade carpet tile, and luxury vinyl plank (LVT).
Scope of work
Scope of work: - Remove and dispose of existing flooring (carpet + underpad / vinyl / etc.) on [X] floors. - Inspect subfloor condition; report on any required repair (T&M allowance). - Floor prep: levelling compound where needed, vacuum, primer per manufacturer spec. - Supply and install new flooring per selected option: - OPTION A: commercial-grade carpet tile (specify product class). - OPTION B: luxury vinyl plank (LVT, 5mm+ wear layer). - New transition strips, vinyl base. - Daily protection of tenant doors and adjacent finishes. - Final cleaning and walk-through. Phasing: - One floor at a time, weekday work hours. - Notify residents 7 days before their floor. - Service elevator coordination required. Add-alternates: - Subfloor repair beyond allowance. - Door undercut for clearance. - Lobby + amenity space flooring.
Standard requirements
- $2M general liability insurance. - WSIB clearance. - Manufacturer-trained installer for selected product. - Three references for occupied multi-unit corridor flooring in the last 24 months. - Plan for protecting unit door frames and tenant furniture in corridor.
Suggested timeline
- RFP open: 21 days.
- Sample submission: All bidders submit physical samples of both options.
- Award: Within 2 weeks of RFP close.
- Project completion: Typically 1 day per corridor per floor; 2–6 weeks total.
Site access & logistics
Building occupied. Work weekdays 8am–5pm. Service elevator available for materials. Each floor will be partially impassable for 1 day during install — plan tenant communication accordingly.
Questions every bidder should answer
- Per-sq-ft installed cost for each option (carpet tile + LVT)?
- What's your wear-layer warranty?
- How do you handle subfloor failures discovered mid-project?
- Crew size and projected timeline per floor?
- Can you provide physical samples of recommended products?
Evaluation criteria
- Total installed cost per option.
- Product quality, wear layer, and warranty.
- Installer certifications.
- References for occupied multi-unit corridor work.
- Phasing and tenant impact plan.