BC government data last updated December 2024. The province has not published a newer Major Projects Inventory.
01About this project
Proposed 19.4 MW hydropower project on Upper Arrow Lake, is 20 km northwest of Nakusp with a planned interconnection near Pingston IPP. The project has been accepted by BC Hydro standing offer program in Mar 2017. The BC Hydro Standing Offer Program (SOP) has been suspended.
| Owner | Fosthall Creek Power LP |
|---|---|
| Location | Nakusp, British Columbia |
| Type | Energy |
| Status | Proposed |
Free account: see the full project
Create a free PMRFP account to see the full project facts (size, timeline, status history, evidence), the trades it needs, and related open bids and recent awards.
Free. No credit card.
02How to get on the bid list
Big projects are not usually tendered trade by trade in public. The owner hires a general contractor or construction manager, who then prequalifies trades and sends out packages. Getting on that list early is how you get the call.
- Find out who the general contractor or construction manager is.
- Prequalify on their trade-partner portal (insurance, safety record, references).
- Ask when the packages for your trade go out, and to be on the invite list.
General contractor and bid-list link: Trade Pro
Trade Pro members see the contractor and bid-list link as soon as they are known, and get an email when this project changes status.
Get told when this project moves.
Trade Pro emails you when a major project in your trade and province changes status, along with every new RFP that matches you.
03Sources and licence
Source: Province of British Columbia, Major Projects Inventory
Contains information licensed under the Open Government Licence – British Columbia.
Last seen in the source on Oct 25, 2026. First listed on PMRFP on Oct 25, 2026.
