01About this project
The Project will consist of the following:- A 100m long underground drift with modern mining installations showcasing technologically advanced equipment and services including WIFI/LTE and BEVs; and- A new, multipurpose training facility and programming space, with a theatre, servery, and washrooms.The Project will feature a customized tour about modern mining. The new one-storey building with a mezzanine houses the multipurpose programming and theatre space where customized programming will take place. It will be connected to the existing Big Nickel drift system by fire rated end portions of the drift. Active
| Location | Sudbury, Ontario |
|---|---|
| Type | Institutional |
| Status | Under construction |
Free account: see the full project
Create a free PMRFP account to see the full project facts (size, timeline, status history, evidence), the trades it needs, and related open bids and recent awards.
Free. No credit card.
02How to get on the bid list
Big projects are not usually tendered trade by trade in public. The owner hires a general contractor or construction manager, who then prequalifies trades and sends out packages. Getting on that list early is how you get the call.
- Find out who the general contractor or construction manager is.
- Prequalify on their trade-partner portal (insurance, safety record, references).
- Ask when the packages for your trade go out, and to be on the invite list.
General contractor and bid-list link: Trade Pro
Trade Pro members see the contractor and bid-list link as soon as they are known, and get an email when this project changes status.
Get told when this project moves.
Trade Pro emails you when a major project in your trade and province changes status, along with every new RFP that matches you.
03Sources and licence
Source: Government of Ontario, Ontario Builds: key infrastructure projects
Contains information licensed under the Open Government Licence – Ontario.
Last seen in the source on Oct 25, 2026. First listed on PMRFP on Oct 25, 2026.
