01About this project
Kathleen Andrews Transit Garage is undergoing a technical evaluation to determine its electrical and structural capacity to support a solar array. Evaluation will also include structural limitations, and the accessibility of the roof and equipment. If viable, the project will design and install an integrated solar photovoltaic array on the facility. Update: Construction is 96% complete. The battery energy storage system (BESS) commissioning is underway. The installation of the solar photovoltaic array is complete and commissioned. The project is anticipated to be completed in summer of 2026. Location: 12403 Fort Rd NW
| Owner | City of Edmonton |
|---|---|
| Location | Edmonton, Alberta |
| Type | Energy |
| Status | Under construction |
Free account: see the full project
Create a free PMRFP account to see the full project facts (size, timeline, status history, evidence), the trades it needs, and related open bids and recent awards.
Free. No credit card.
02How to get on the bid list
Big projects are not usually tendered trade by trade in public. The owner hires a general contractor or construction manager, who then prequalifies trades and sends out packages. Getting on that list early is how you get the call.
- Find out who the general contractor or construction manager is.
- Prequalify on their trade-partner portal (insurance, safety record, references).
- Ask when the packages for your trade go out, and to be on the invite list.
General contractor and bid-list link: Trade Pro
Trade Pro members see the contractor and bid-list link as soon as they are known, and get an email when this project changes status.
Get told when this project moves.
Trade Pro emails you when a major project in your trade and province changes status, along with every new RFP that matches you.
03Sources and licence
Source: City of Edmonton, capital projects
Contains information licensed under the Open Government Licence – City of Edmonton.
Last seen in the source on Oct 25, 2026. First listed on PMRFP on Oct 25, 2026.