01About this project
This project includes upgrades to Terwillegar Drive/Whitemud Drive interchange, widening and upgrades to the Rainbow Valley Bridges, and widening of Whitemud Drive. Transit priority measures connecting the planned dedicated bus lanes on Terwillegar Drive to South Campus LRT station are also under consideration as part of this project. Update: The Rainbow Valley Pedestrian Bridge and the 142 Street Pedestrian Bridge opened to the public in July 2026. Terwillegar Drive Stage 2 work is underway, with project completion expected by the end of 2026.
| Owner | City of Edmonton |
|---|---|
| Location | Edmonton, Alberta |
| Type | Infrastructure |
| Status | Under construction |
Free account: see the full project
Create a free PMRFP account to see the full project facts (size, timeline, status history, evidence), the trades it needs, and related open bids and recent awards.
Free. No credit card.
02How to get on the bid list
Big projects are not usually tendered trade by trade in public. The owner hires a general contractor or construction manager, who then prequalifies trades and sends out packages. Getting on that list early is how you get the call.
- Find out who the general contractor or construction manager is.
- Prequalify on their trade-partner portal (insurance, safety record, references).
- Ask when the packages for your trade go out, and to be on the invite list.
General contractor and bid-list link: Trade Pro
Trade Pro members see the contractor and bid-list link as soon as they are known, and get an email when this project changes status.
Get told when this project moves.
Trade Pro emails you when a major project in your trade and province changes status, along with every new RFP that matches you.
03Sources and licence
Source: City of Edmonton, capital projects
Contains information licensed under the Open Government Licence – City of Edmonton.
Last seen in the source on Oct 25, 2026. First listed on PMRFP on Oct 25, 2026.
