01About this project
Valley Line West is a 14-kilometre light-rail extension from 102 Street downtown to Lewis Farms. It is the second stage of the Valley Line; an urban-style, 27-kilometre LRT line that will operate between Mill Woods and Lewis Farms. The project scope includes: the supply of light rail vehicles, 14 kilometres of double track, 14 stops, two elevated stations, two LRT bridges, an elevated LRT guideway, a light-rail vehicle (LRV) storage facility, one new bus terminal, two reconfigured bus terminals and one Park & Ride facility. The City has awarded the contract to design, build and partially finance the Valley Line West LRT to Marigold Infrastructure Partners. Major construction is well underway along various sections of the LRT alignment. Update: The project remains active along the alignment in 2026, including full closure of 102 Ave, stops and stations, the Lewis Farms storage facility, and Gerry Wright operations and maintenance facility. Marigold Infrastructure Partners (MIP) has achieved 68.7% progress (as of the end of June 2026) as measured by the Independent Certifier. The first LRV manufactured by Hyundai Rotem Corporation (HRC) was shipped from Korea and arrived in Edmonton on July 30, 2025. The Light Rail Vehicle (LRV) is currently stored in Gerry Wright Operations and Maintenance Facility A, awaiting further testing and co…
| Owner | City of Edmonton |
|---|---|
| Location | Edmonton, Alberta |
| Type | Infrastructure |
| Status | Under construction |
Free account: see the full project
Create a free PMRFP account to see the full project facts (size, timeline, status history, evidence), the trades it needs, and related open bids and recent awards.
Free. No credit card.
02How to get on the bid list
Big projects are not usually tendered trade by trade in public. The owner hires a general contractor or construction manager, who then prequalifies trades and sends out packages. Getting on that list early is how you get the call.
- Find out who the general contractor or construction manager is.
- Prequalify on their trade-partner portal (insurance, safety record, references).
- Ask when the packages for your trade go out, and to be on the invite list.
General contractor and bid-list link: Trade Pro
Trade Pro members see the contractor and bid-list link as soon as they are known, and get an email when this project changes status.
Get told when this project moves.
Trade Pro emails you when a major project in your trade and province changes status, along with every new RFP that matches you.
03Sources and licence
Source: City of Edmonton, capital projects
Contains information licensed under the Open Government Licence – City of Edmonton.
Last seen in the source on Oct 25, 2026. First listed on PMRFP on Oct 25, 2026.
