This is a development application: an early signal, usually one to three years before construction. The design, size and timing can still change, and no value is published yet.
01About this project
Proposal of five residential/mixed-use buildings, with heights of 48 storeys (Building D1), 46 storeys (Building D2), 44 storeys (Building D3) and 42 storeys (Building D4), as well as a 12-storey mid-rise building (Building D5). Total 2,424 residential units, gross floor area (GFA) of 160,204 square metres, comprised of 158,567 square metres of residential GFA and 1,637 square metres of non-residential GFA, resulting in a density of 7.21 FSI. Providing a 1,854.7 square metre new public park, a 2,362 square metre conveyance to the TRCA along the East Highland Creek, and a 401 square metre daycare facility. Application 26 115551 ESC 24 OZ. Related applications on this site: 26 115508 ESC 24 SB (subdivision application, Under Review).
| Location | Toronto, Ontario |
|---|---|
| Type | Mixed use |
| Status | Development application |
Free account: see the full project
Create a free PMRFP account to see the full project facts (size, timeline, status history, evidence), the trades it needs, and related open bids and recent awards.
Free. No credit card.
02How to get on the bid list
Big projects are not usually tendered trade by trade in public. The owner hires a general contractor or construction manager, who then prequalifies trades and sends out packages. Getting on that list early is how you get the call.
- Find out who the general contractor or construction manager is.
- Prequalify on their trade-partner portal (insurance, safety record, references).
- Ask when the packages for your trade go out, and to be on the invite list.
General contractor and bid-list link: Trade Pro
Trade Pro members see the contractor and bid-list link as soon as they are known, and get an email when this project changes status.
Get told when this project moves.
Trade Pro emails you when a major project in your trade and province changes status, along with every new RFP that matches you.
03Sources and licence
Source: City of Toronto, development applications
Contains information licensed under the Open Government Licence – Toronto.
Last seen in the source on Nov 22, 2026. First listed on PMRFP on Oct 25, 2026.
