This is a development application: an early signal, usually one to three years before construction. The design, size and timing can still change, and no value is published yet.
01About this project
Official Plan Amendment proposing redevelopment of the Hearn Power Generating Station. The site is subject to the Port Lands Area Specific Policies of the City's Central Waterfront Secondary Plan, which envisions the Hearn as a catalytic destination for cultural, sport, entertainment, recreational and institutional uses within a revitalized iconic heritage building. The Hearn is surrounded by power generation and distribution infrastructure, port and heavy industrial uses and natural areas. Residential uses are not currently permitted. The application proposes 739,567 square metres of Gross Floor Area (GFA) including adaptive reuse of the existing power station building and development of seven new buildings with tower elements across the site. A mix of retail, commercial and other non-residential uses are proposed, together with 8,400 residential units and 2,522 vehicle parking spaces. Application 24 253487 STE 14 OZ.
| Location | Toronto, Ontario |
|---|---|
| Type | Mixed use |
| Status | Development application |
Free account: see the full project
Create a free PMRFP account to see the full project facts (size, timeline, status history, evidence), the trades it needs, and related open bids and recent awards.
Free. No credit card.
02How to get on the bid list
Big projects are not usually tendered trade by trade in public. The owner hires a general contractor or construction manager, who then prequalifies trades and sends out packages. Getting on that list early is how you get the call.
- Find out who the general contractor or construction manager is.
- Prequalify on their trade-partner portal (insurance, safety record, references).
- Ask when the packages for your trade go out, and to be on the invite list.
General contractor and bid-list link: Trade Pro
Trade Pro members see the contractor and bid-list link as soon as they are known, and get an email when this project changes status.
Get told when this project moves.
Trade Pro emails you when a major project in your trade and province changes status, along with every new RFP that matches you.
03Sources and licence
Source: City of Toronto, development applications
Contains information licensed under the Open Government Licence – Toronto.
Last seen in the source on Nov 22, 2026. First listed on PMRFP on Oct 25, 2026.
